Don't you love having obstacles at the Showgrounds? We've seen a number of people out there checking them out!!
There are more to come and the Field Committee is planning to work on three obstacles JULY 18th from 1pm - 5pm.
Come on down, bring some power tools and lend a hand!!
Metal Gate - Straighten bent base pipe, adjust gate and latch to move smoothly.
Tire Climb - Install gopher wire, cover the wire, & position tires as directed by Robin.
2 Step/Box - Dig post holes with tractor, set vertical posts, lay gopher wire, and build the frame of the 2 box. Building will include moving and drilling into heavy poles, then bolting them together as directed by Elise. Boxes & Tires will be filled later with dirt & rock.
If all of the above get done, there is more prep work to be done for obstacles still in process of being built.